How much time is needed for the installation?
Generally, the installation process takes between one and two days, although this can vary based on your basement’s condition and size.

Our Locations
Fargo, ND
1330 41st St. N
Fargo, ND 58102
Minneapolis, MN
6265 Carmen Ave.
Inver Grove Heights, MN 55076
Rush City, MN
1325 S Frandsen Ave
Rush City, MN 55069
